Installation instructions

1. Saw the floor along the shortest route, using the Aluduct to mark the cutting edge, with a tungsten tip saw blade to leave clearance for the lid to drop back into the ducting

 

2. Remove the insulation

3. Drop in the Aluduct

 

4.Secure the Aluduct with 25mm x 2mm twist nails or annular ring shank through the pre-drilled holes

5. Replace the original chipboard lid after the pipework has been fitted and tested for leaks

 

 